Bellevue Hotel Complex

The Project

Total demolition and abatement of Azteca, 7-story Sheraton hotel, and accompanying buildings right off i405 in Bellevue, WA. The hotel was constructed of a mix of pre-cast and cast in place concrete elements and required a highly orchestrated and specific demolition method to be brought to the ground safely. The Azteca restaurant required significant exterior abatement of its entire Stucco finishing system. This was accomplished in a full exterior enclosure under negative pressure. After demolition was completed, nearly 5,000 tons of concrete was processed and left on site to stabilize basement walls and foundations which were remaining in place. 

View Case Study PDF

Abatement of Sheraton Hotel complex | Ascendent Demolition
Gut-out of Sheraton Hotel complex | Ascendent Demolition
High reach demo of Sheraton Hotel complex | Ascendent Demolition
High reach demo of seven story hotel | Ascendent Demolition

View Additional Demolition Case Studies

Concrete crushing on site of Tyee High School demo | Ascendent Demolition

Tyee High School

The Project Total demolition and abatement of Tyee High School. A major component of the scope of work was to carefully salvage and prep the

Read More »
Demolition of Tacoma News Tribune Building | Ascendent Demolition

Tacoma News Tribune

The Project The total demolition of the 240,000 square foot former Tacoma News Tribune building. Prior to full demolition, the interiors of the building were

Read More »
Demo and abatement by Ascendent Demolition

Stream 201

The Project Ascendent was tasked with completing the interior demolition of a 4-story office building so the space can be re-purposed for multi-family housing. The

Read More »
Ice rink demolition | Ascendent Demolition

Shoreline Ice Rink

The Project Total demolition and abatement of Highland Ice Arena in Shoreline, WA. One of the biggest challenges of this project was the ice rink

Read More »
Demo of Rainier plant tower | Ascendent Demolition

Rainier Plant

The Project Total demolition and abatement of both process buildings at Two Rivers Terminal in Moses Lake, WA. Structures were over 70’ in height and

Read More »
Demo of Mary Bridge Hospital | Ascendent Demolition

Mary Bridge Hospital

The Project Ascendent completed the asbestos abatement and complete structure demolition of the former Jackson Hall and Parking Garage at the Tacoma Mary Bridge Hospital

Read More »