The Project
Total demolition and abatement of both process buildings at Two Rivers Terminal in Moses Lake, WA. Structures were over 70’ in height and were a mix of large structural steel and concrete construction. A LaBounty MSD 3000R Shear supported by a Komatsu PC800 was the tool of choice for cutting and separating the heavy steel columns and beams at height during the demolition. Ascendent was able to recycle over 75% of all generated material from this project. Project scale was nearly $500,000 and 76,000 square feet.