Tyee High School

The Project Total demolition and abatement of Tyee High School. A major component of the scope of work was to carefully salvage and prep the existing glue laminated beams for re-use in the new school. Beams were successfully removed during demolition of the structure lead coating was removed via sandblasting in a large exterior containment. […]
Shoreline Ice Rink

The Project Total demolition and abatement of Highland Ice Arena in Shoreline, WA. One of the biggest challenges of this project was the ice rink itself, this consisted of multiple layers of foam as well as tubing filled with glycol, sand, and gravel. Prior to structural demolition the foam and tubing had to be removed […]
Rainier Plant

The Project Total demolition and abatement of both process buildings at Two Rivers Terminal in Moses Lake, WA. Structures were over 70’ in height and were a mix of large structural steel and concrete construction. A LaBounty MSD 3000R Shear supported by a Komatsu PC800 was the tool of choice for cutting and separating the […]
Mary Bridge Hospital

The Project Ascendent completed the asbestos abatement and complete structure demolition of the former Jackson Hall and Parking Garage at the Tacoma Mary Bridge Hospital Site. Extreme care and caution was required due to its proximity to the hospital which remained active with zero interruptions during completion of the demolition. Automated dust suppression cannons were […]
Lewiston Water Treatment Plant

The Project Total demolition and abatement of old Admin and Chemical buildings at the Lewiston Water Treatment Plant in Lewiston, ID. External tank and ballast was demolished first and was back filled with processed re-used materials. The old chemical building was originally built in 1923 and utilized a concrete and brick construction. Ascendent was able […]
Harrison Hospital

The Project Total demolition and abatement of the former Harrison Medical Center, located in Bremerton WA. The continuous structure was built in multiple phases and included varying construction types all requiring varying demolition methods to ensure safety and efficiency. Prior to structure demolition a significant effort for architectural and interior salvaging was undertaken in partnership […]
Denny Triangle

The Project The complete structure demolition and asbestos abatement of Loyal Inn and adjacent office space in Seattle, WA. Automated dust suppression cannons were used to aid workers in managing dust generation. Processed material from the parking garage demolition was used to help stabilize the ground after the project was complete. Total project size was […]
Bellevue Hotel Complex

The Project Total demolition and abatement of Azteca, 7-story Sheraton hotel, and accompanying buildings right off i405 in Bellevue, WA. The hotel was constructed of a mix of pre-cast and cast in place concrete elements and required a highly orchestrated and specific demolition method to be brought to the ground safely. The Azteca restaurant required […]
Lincoln School in Seattle, WA

The Project Ascendent Demolition successfully completed the demolition of Lincoln School, a significant historical landmark in Seattle, WA. The structure consisted of three distinct sections: the central wing (built 1906), north wing (built 1914), and south wing (built 1930), totaling over 200,000 square feet. The project required specialized handling of the exterior historical elements including […]
Bellevue E340 Garage

The Project Ascendent Demolition successfully executed the partial demolition of a 4-story post-tension concrete parking structure, removing one half of the facility while maintaining the other half in active operation. The project demanded extensive specialized engineering to address the complex safety requirements associated with post-tension concrete demolition. This strategic demolition cleared the way for future […]